Mud Engineering Equipment Year: 2015 Refurbishment and renovation of 3 phase separator. Posted in Mud Engineering Equipment, Pressure Vessels, Process and Well Control Skids, ProjectTagged Carbon Steel, Commissioning, CS, Design, Drilling, Engineering, Fabrication, Frac Tank, Installation, Mud Tank, Oil & Gas, Oil Rig, Rig, Tank, Trailer Mounted, Welding Post navigation Previous Previous post: Repair and Refurbishment of Cementing UnitNext Next post: Engineering, Design and Fabrication of Wheel Frac Tanks Related Projects Engineering, Design and Repair as per ASME “R” Stamp Engineering, Design, Fabrication and Supply of ASME “U” Stamped Vessel Engineering, Design, Fabrication, Commissioning of Mud Tank System